Internal Rail
Reinforcements (Work
time – 1 hour + 24 h glue drying time)
Longitudinal
internal
rail reinforcements are useful for add glue surface on both deck and
rails.
_
Test each splint (10 x 10 mm Samba wood) before gluing them,
_
Slip
each splint into notches in the frames using polyurethane wood glue
_
Clamp in the right curve & wait for 24 h for drying glue time
Nessun commento:
Posta un commento